STADIUM ARENA

The Assignment: Renovating the concrete stairs in one of the largest stadiums in the Netherlands.

The Challenge: Time pressure was the biggest enemy. Between matches and events, 12,000 steps had to be cleaned, repaired, and coated. In addition, the coating had to be extremely wear-resistant (Heavy Duty) and meet the highest safety requirements regarding slip resistance (R12/R13 Anti-slip).

The Result: A sleek, safe, and durable staircase that can withstand millions of footsteps for years to come.

In collaboration with:
Commissioned by:
Together with:
Stadium Renovation
Interior & Design

Exclusive Wall Transformation (Seamless Photo Wallpaper)

The Challenge

Transforming a giant, boring wall into the absolute centerpiece of the room using a life-size, seamless photo wall (mural/sticker wallpaper). With a wall-filling image of this size, absolute perfection is required: every millimeter of deviation, every speck of dust, or every tiny air bubble ruins the complete design and illusion.

The Solution

Success starts at the base. We first made the bare wall 100% sleek, smooth, and dust-free, followed by a special primer to guarantee perfect adhesion. Then the heavy, self-adhesive wall textile was applied seamlessly, strip by strip, using laser alignment and utmost precision, and professionally smoothed out.

Technique & Result

Result: A breathtaking, super sleek design wall that instantly and totally changes the atmosphere in the room.
Technique: Deep cleaning, Priming, Laser alignment, Bubble-free application of heavy wall textile.

BASE
100% Smooth & Dust-Free
EXECUTION
Surgical Precision
The Master's Secret: "People often think applying a large interior sticker is easy. But the secret of a perfect wall mural is not in the pasting itself, but in the preparation of the wall. Only on a perfectly prepared surface does the material adhere without a single blister or wrinkle."
Machine & Industry

Production Line Revision

The Problem

Machines were heavily contaminated with oil and the paint layer was affected. Disassembling parts was technically impossible, which ruled out spraying with mist risk.

The Solution

Extremely thorough manual degreasing. Subsequently, traditional painting (rolling and brushing) was chosen to work accurately around the fixed parts without overspray.

Technique

Precision handwork, Brush & Roller, High-Solid industrial paint.

METHOD
Handwork (Precision)
FLEXIBILITY
No Disassembly
Our Approach: "Because the machine could not be disassembled, spraying was not an option. By hand we could reach every corner and protect the fragile sensors. Craftsmanship goes above speed."
Specials & Heights

Silo Renovation

The Challenge

Height and accessibility. The silo showed traces of oxidation. Safety and the environment were paramount in this outdoor project.

The Solution

Use of an aerial platform. The silo was treated with a rust-preventive primer and a coating resistant to UV radiation and weather influences.

Technique

Aerial platform, High-pressure cleaning, Application at heights.

EQUIPMENT
Aerial Platform
GOAL
UV Protection
Our Approach: "Safety first. By using the right equipment, we were able to reach the top of the silo and apply a coating that remains colorfast for years."
Logistics Real Estate

Overhead Door Renovation

Exterior

Outsides of loading docks were discolored by the sun. We restored these to the original color for a uniform appearance.

Interior

Inner doors get damaged by internal transport. We repair scratches and apply a strong coating that can take a beating again.

Technique

Sanding, Masking, Coating (Cost saving compared to replacement).

BENEFIT
Cost Saving
FINISH
Factory New
Our Approach: "Why replace if renovation is possible? We carefully mask all rubbers and mechanisms, so that only the panel is sprayed. The result is indistinguishable from new."
Exterior

Facade Restyling

Objective

The building had an outdated look. The assignment was to give the building a modern look without constructive modifications.

Solution

Cleaning and recoating the metal facade panels (corrugated sheets). Use of a coating that remains flexible with temperature changes.

Result

Increase in value of the real estate and protection against acid rain.

SURFACE
Corrugated Profile
EFFECT
Modernization
Our Approach: "A fresh facade is the calling card of your company. With our technique, we spray large areas in a short time, with minimal disruption to your business operations."
Renovation & Restoration

Window Frame Renovation

Damage Assessment

The paint showed blistering and was peeling off. This indicated underlying moisture problems and poor adhesion of the old layer.

Sanitation

We stripped the frames down to the healthy wood. Wood rot was removed and professionally repaired.

Coating

A new paint system was built up from the primer to the topcoat, for years of protection.

BASE
Wood Sanitation
DETAIL
Thorough Sanding
Our Approach: "Painting over rotten wood is pointless. We invest time in preparation and repair. Only on a healthy base does paint stay put for years."
Concrete Renovation

Balcony Floor Renovation

Concrete Repair

The old floor was cracked and polluted. Cracks in concrete can lead to leaks and concrete rot.

System

Removal of old layers, repair of the substrate, and the application of a new, seamless finish layer.

Result

A waterproof floor that protects the concrete and looks sleek.

FUNCTION
Waterproof
MAINTENANCE
Seamless
Our Approach: "A balcony floor suffers a lot from wind and weather. We ensure a finish that is not only beautiful, but protects the construction of your home."
Safety & Logistics

Industrial Line Marking (5S)

Order & Cleanliness

Application of floor line marking (tapes/coating) according to plan for pallet places and walking routes.

Flexibility

To not disturb production, we adapted our working hours to the client's schedule (after 14:00 and on weekends).

Result

A clear warehouse that meets safety requirements.

PLANNING
Evening & Weekend
PRECISION
According to Plan
Our Flexibility: "The production could not come to a standstill. That is why we worked on Saturdays and after 14:00, when the client's staff went home. We adapt our schedule to you, not the other way around."
Interior & Technique

High-End Washroom

The Problem

A small, outdated space that was not functional. The desire was a complete transformation from a bare shell to a luxury finish.

The Solution

Everything was removed down to the bare brick. We re-leveled the floor, relocated pipes and electricity (new sockets and lighting), tiled, and finished it sleekly.

Technique

Demolition work, Installation technology, Leveling, Tiling & Finishing.

RENOVATION
Total Concept
INSTALLATION
Electrical & Lighting
Total Approach: "From the raw brick to the final sealant edge. We completely rebuilt this space, including relocating pipes for the washing machine and dryer. Functionality meets design."